We carried out an intervention in a biomass boiler in Girona. During the maintenance shutdown we analyzed the affected areas and proposed to the customer a technical solution within 24 hours.
After the approval of the proposal by our client, we started to manufacture the refractory concrete needed for the repair (in this case our quality PYROFORM SC-50/G-3), we also prepared the rest of the insulating materials and the metallic anchors for the concrete. We were able to finish the work in 48 hours (less time than estimated).
Our client has been very happy with the complete design, fabrication and installation service. If your plant has a biomass boiler you can count on us for the redesign with high durability materials. For more information just